SMA-22-007 S Pekin Sewer Repair
Installation of new sewer line and service connection on S Pekin in Woodland, WA. General project location is shown on included map. As-builts of original construction and video inspection report will also be provided. Project work shall be in accordance with City of Woodland standards and codes.
South Pekin Sewer Project does NOT require a Bid Bond, but will require performance & payment bonds. Retainage Bond is your choice.
For more information, click on the attachments below.
UPDATE: Original due date was April 25, 2022 4:00PM. The due date has been extended to June 1, 2022 4:00PM
Project Update 5/25/2022
The City is withdrawing the invitation to bid SMA-22-007 at this time in order to revise the scope and prepare engineering drawings.