City of Woodland - Water Reservoir #4

Application Number: 
SEP-23-007 & WLD-2023-021
Applicant: 
City of Woodland
Notice Date: 
Monday, December 18, 2023
Project Type: 
Land Use/Planning
Project Status: 
Approved with Conditions
Location: 
Water Treatment Plan

The city is proposing to construct a new potable water storage reservoir, known as Reservoir No. 4, with a nominal volume of 1.5 million gallons on the City of Woodland Water Treatment Plant site.

The reservoir will provide storage and needed service pressure to meet anticipated peak day and fire flow demands. The new reservoir will be a glass-fused to steel bolted reservoir. The base of the tank will be at ground level with a 106-foot diameter and 29-foot height.

The tank will be located to the northeast of the existing Water Treatment Plant and have the same overflow elevation as the existing Reservoir No. 3. Once Reservoir No. 4 is online and operational the existing 500,000-gallon Reservoir No. 2 will be removed from service and demolished.

The project includes resurfacing of the existing gravel access road with HMA and extension of the road to the new reservoir. Site piping, storm, fencing, restoration, electrical, telemetry, and instrumentation are included.

Status Updates

A Public Hearing was scheduled for January 12th, 2024 at 10:00 am in the Woodland Council Chambers at 200 E Scott Avenue in Woodland WA, 98674. This hearing was completed and the Examiner issued the decision on January 16th, 2024.